The McKinley Dollhouse Week 23

Before I could install the flooring on the third floor, I needed to finish the back sides of the tower. I primed the floor with a paint color similar to the flooring, just as I had done for the other two floors. I also primed the back wall and the tower walls in white to prepare them for wallpapering. 

After the primer dried, I applied the wallpaper. The attic is designed as two rooms, but you can combine them into one if you prefer. It’s hard to distinguish where one room ends and the other begins since the roof hasn’t been installed yet, but you can use the bathroom wall on the second floor as a guide. Follow that wall upwards to ensure you use the correct wallpaper print for each attic room. 

Finally, I installed the flooring, which is the same vinyl wood-look flooring I used throughout the dollhouse.