The Fairfield Dollhouse Revisited Week 16

The tower construction will be a phased process, with the front wall requiring initial installation to enable door placement. I've decided to transform the window above the front door into another door entrance. Since finding miniature half-scale French doors is challenging and costly, I'll address that detail later. 

For now, I've enlarged the window opening using the kit's bathroom door as a template, confident in my ability after successfully completing the staircase. I've primed the wall and applied wallpaper to the first and second floor sections. It's crucial to wallpaper this wall completely before installation and ensure it's thoroughly dry, as it will need to slide into a specific slot in the porch roof. To guarantee proper fitting, I must not attach any windows or doors to the wall prior to installation.